ADU Building in Washington State

January 202615 min read

Accessory Dwelling Units (ADUs) have exploded in popularity across Washington State. Recent legislation has made it easier than ever to add a backyard cottage, convert a garage, or build above your detached garage. This guide covers everything you need to know to plan, permit, and build your ADU.

Types of ADUs

ADU is an umbrella term for several types of secondary dwelling units. Understanding the options helps you choose the right approach for your property.

DADU (Detached ADU)

A standalone structure in your backyard. Most flexibility for design and privacy. Often called a "backyard cottage."

$250,000 - $450,000+

Attached ADU

Built as an addition to your existing home, with a separate entrance. Shares a wall with the main house.

$150,000 - $350,000

Garage Conversion

Convert an existing garage into living space. Often the most affordable option if you don't need the garage.

$100,000 - $200,000

Above-Garage Unit

Living space built above a new or existing detached garage. Efficient use of space on smaller lots.

$300,000 - $500,000

Zoning and Regulations

Washington's 2023-2024 housing legislation dramatically expanded ADU allowances statewide. Here's what you can generally build:

Two ADUs allowed on most single-family lots (one attached, one detached)

No owner occupancy requirement in most jurisdictions

No off-street parking required for ADUs within ½ mile of transit

Reduced setbacks for ADUs (often 5 feet)

Height limits typically 24-28 feet depending on jurisdiction

Important: Check Your Specific Jurisdiction

While state law sets minimums, cities can be more permissive. Seattle, Bellevue, and other cities have their own ADU codes with specific size limits, design standards, and lot coverage rules. Always verify requirements with your local building department before designing.

Size Limits by Jurisdiction

CityMax DADU SizeNotes
Seattle1,000 sq ftPre-approved plans available
Bellevue900 sq ftNew code as of 2024
Kirkland1,000 sq ftOr 60% of main house
Redmond1,000 sq ftLot coverage limits apply

Costs: What to Budget

ADU costs vary widely based on size, design, site conditions, and finishes. Here's what to expect in the Seattle area:

Cost Breakdown for a Typical 800 sq ft DADU

Design & permits: $25,000 - $50,000

Site work & foundation: $40,000 - $80,000

Construction: $180,000 - $280,000

Utilities connection: $15,000 - $40,000

Landscaping/restoration: $10,000 - $25,000

Cost Per Square Foot

For new construction DADUs in the Seattle area, expect $350 - $500 per square foot all-in. Higher for challenging sites, luxury finishes, or complex designs. Conversions and attached ADUs typically cost less.

Design Considerations

Good ADU design balances these factors:

Lot constraints: Setbacks, lot coverage, and height limits shape what's possible

Privacy: Window placement and entry location for both units

Utilities: Where will sewer, water, and electrical connect?

Parking: Do you need to maintain or replace garage space?

Future use: Rental, family, or home office—each has different needs

Pre-Approved Plans

Seattle offers pre-approved ADU plans that expedite permitting. These can save 2-4 months and $10,000-$20,000 in design costs, but they offer less customization. They work best for standard lots with good access.

The Permit Process

Expect permitting to take 3-6 months depending on:

Your jurisdiction (Seattle is generally faster than some Eastside cities)

Whether you use pre-approved plans

Complexity of your design

Any variances or design review required

Typical Permit Steps

1

Pre-application meeting

Optional but recommended to clarify requirements early

2

Submit plans

With site survey, engineering, and architectural drawings

3

Plan review

4-12 weeks depending on city

4

Corrections

1-2 rounds typical

5

Permit issuance

Ready to build!

Construction Timeline

Once permits are in hand, expect 5-8 months of construction for a new DADU:

Weeks 1-3: Site prep, utilities, foundation

Weeks 4-8: Framing, roofing, windows

Weeks 9-14: Rough mechanical, electrical, plumbing

Weeks 15-18: Insulation, drywall, paint

Weeks 19-24: Finishes, cabinets, flooring

Weeks 25-28: Final fixtures, punch list, landscaping

Conversions and attached ADUs typically take 3-5 months.

ROI: Is an ADU Worth It?

ADUs can provide return in multiple ways:

Rental Income

A well-designed 800 sq ft ADU in Seattle rents for $2,000 - $2,800/month. That's $24,000 - $33,600/year before expenses. At a $350,000 build cost, that's a 7-10% gross return—before appreciation.

Property Value

ADUs typically add 20-30% of construction cost to property value immediately, with potential for more as the rental market develops. A $350,000 ADU might add $70,000-$105,000 in appraised value.

Other Benefits

Housing for aging parents or adult children

Home office or studio space

Future flexibility as needs change

Helping address housing shortage (good for the community)